BP Sunbury Switch Panel

BP Sunbury Switch Panel

BP Sunbury Laboratory facilities Switchboard Replacement.
Request A Quote
Overview!

On Behalf of ECO of London,

CB Services carried out the replacement of the existing 1200 amp switchboard which was of age where it was unsupportable and non-compliant. We were responsible for design development, installation and commissioning of the new 1200 amp supply LV switchboard. The programme was 7 Days.

The works included the following:

• Intrusive site surveys to include electrical testing to all sub main circuits supplied from the existing switch panel.

• Manage the design of the new panel to ensure all existing cables & switches where installed to suit existing cable lengths as far as possible.

• Installation of temporary light and small power to safety critical circuits within the labs.

• Isolation, disconnection, strip out and removal of the existing LV switchboard.

• Installation of new LV switchboard.

• Testing and commissioning of new LV switch board including testing of all connected circuits and EPO contactors/BMS connections.

• O&M documentation.

Client: BP
Location: London, England